Kot Palak-1 Early Production Facility is RISE’s signature upstream EPCC reference — a greenfield scope demonstrating integrated engineering, procurement, construction, and commissioning capability through operations transition.

The Al-Haj facility handles pressure boosting at 950 PSIG for a design flowrate of 50 MMSCFD to the sales gas tie-in pipeline, with condensate stabilization and processing of 2,500 BBL/day. RISE delivered quantified construction evidence including 18,350 inch-dia of piping, 202 field instruments, and 25 tons of structural steel.

Project delivery addressed remote location logistics, community sensitivity, and stringent HSE compliance — with dedicated mobilization of management, planning, QA/QC, HSE, civil, and operations staff alongside third-party certified equipment and operators.

Structural assembly, lifting, tube bundle installation, and commissioning for PPL air cooler scope.

Foundations, piping, alignment, mechanical completion, and start-up for OGDCL compressor packages.