Commissioning readiness from installation through stable operation — loop checks, hydrotesting, punch-list, energization, and operations handover with zero-compromise HSE.
MC
Mechanical completion
202
Instruments (flagship)
0
LTI target
Pre-commissioning
- Mechanical completion verification and punch-list management
- Cleaning, flushing, and blow-down of piping systems
- Hydrotesting, leak testing, and reinstatement
- Instrument loop checking and calibration verification
- Ready-for-commissioning sign-off with client and EPC teams
Functional & performance testing
- Loop checking, functional and performance testing
- Energization support for electrical and instrument systems
- Control system logic verification and interlock testing
- Compressor and rotating equipment run-in procedures
- Performance verification against design basis and OEM criteria
Start-up coordination
- Start-up planning with client operations and OEM representatives
- Phased energization and first-oil / first-gas support
- Troubleshooting during initial operation windows
- Operator training and handover during live commissioning
- Documentation of as-commissioned settings and baselines
HSE during commissioning
- Controlled energization and pressure testing with PTW and JHA
- Toolbox talks and isolation verification before each phase
- Simultaneous operations coordination on live and adjacent plants
- Target zero LTI culture on commissioning teams
- Emergency response readiness for remote field locations
References
- Kot Palak-1 EPF — multi-discipline commissioning and MC
- OGDCL compressor packages — Kunnar and Sinjhoro start-up
- PPL air cooler and cooling train scopes
- Integrated commissioning teams for EPCC and brownfield upgrades