EPCC

EPCC DELIVERY

EPCC

Integrated EPCC execution — engineering and procurement coordination, multi-discipline construction, commissioning, and operations transition as a single accountable field partner.

50
MMSCFD facility
$10M
Flagship value
20
Months delivery

Engineering & procurement

  • Multi-discipline engineering coordination with quantified deliverable sets
  • Vendor document review, procurement tracking, and expediting
  • Technical bid support and equipment specification alignment
  • FAT planning and witness support for critical packages
  • 197+ deliverables on flagship Kot Palak-1 scope

Construction disciplines

  • Civil — foundations, roads, drainage, and underground utilities
  • Mechanical — equipment setting, alignment, piping, and steel erection
  • Electrical — cable trays, power cabling, MCC panels, and earthing
  • Instrumentation — field instruments, loop checking, and DCS interfaces
  • 18,350 inch-dia piping and 25 tons structural steel on flagship reference

Commissioning & handover

  • Pre-commissioning, hydrotesting, and mechanical completion
  • Loop checking, energization, and start-up support
  • Punch-list management through turnover
  • O&M transition packages and operator training
  • Single-window accountability from MC through stable operations

Remote & logistics execution

  • Mobilization of manpower, camp, stores, and mess facilities
  • Cranes, excavators, concrete equipment, and certified operators
  • Third-party logistics for security-sensitive and remote KPK locations
  • Community-sensitive execution with stringent HSE compliance
  • Porta cabin camps and site infrastructure on greenfield scopes

Flagship reference

  • Kot Palak-1 Early Production Facility — 50 MMSCFD, ~USD 10 Mn, 20 months
  • 950 PSIG compression and 2,500 BBL/day condensate stabilization
  • Construction and execution partner to DZR Energy for AEPL
  • 202 field instruments and 13,500 m power cable installed

REQUEST FOR QUOTATION

Discuss your scope with RISE

Share equipment, location, timeline, and technical requirements — we respond within 24 hours.

Submit RFQ